Hi!

We are excited about the potential savings we have calculated for you!

Email sent to your email!

Number of projects

Average construction cost per square foot

$

Average size per project in square feet

Average construction time per project in weeks

Average construction time per project in weeks

Your calculated results:

Total cost savings (USD)

$0

Total savings CO2 equivalents (tons)

0

Yearly (12 months)

Reduced construction time

Reduction in construction time with Fonn. Number in days

f28

Savings on interest from construction loans

f29

Total savings (USD)

f29

Reduced number of errors/mistakes

f32

Savings for main contractor

Savings as a result of more efficient project managers, communication and structure (USD)

f36

Savings as a result of reduced travel time for project management (USD)

f37

Total savings (USD)

f38

Mistakes and errors

Savings on production time, due to reduction in errors/mistakes (USD)

f41

Savings as a result in reduced travel time for project management (USD)

f42

Savings on driving expenses (USD)

f43

Savings as a result of reduced travel time (USD)

f44

Total savings for main contractor (USD)

f45

Savings on reduced material waste in CO2 equivalents (tons)

f47

Savings due to reduced need for transportation in CO2 eq. (tons)

f48

Total CO2 saving for main contractor (tons)

f49

Savings for subcontractors
Mistakes and errors

Savings on production time, due to reduction in errors/mistakes (USD)

f54

Savings on production time, due to reduction in errors/mistakes (hours)

f55

Savings on production cost of material, due to reduction in errors/mistakes (USD)

g56

Savings on driving expenses (USD)

f57

Savings as a result of reduced travel time (USD)

f58

Total savings for subcontractors (USD)

f59

Savings on reduced material waste in CO2 equivalents (tons)

f62

Savings due to reduced need for transportation in CO2 eq. (tons)

f63

Total CO2 saving for subcontractors (tons)

f64

Reduced transportation as a result of better coordination (main contractor)

Reduction in travel

f68

Savings on driving expenses (USD)

f69

Cost saving as a result of less time spent (USD)

f70

Cost savings on transportation (USD)

f71

CO2 savings on transportation (tons)

f72

Summary

Total savings for main contractor (USD)

f76

Total savings for subcontractors (USD)

f77

Total cost savings (USD)

f78

Total savings CO2 equivalents (tons)

f79

The calculations are based on qualitative and quantitative surveys** with the client base we have in the US today.

The savings will only be relevant to anyone who does NOT currently have a cloud-based, construction management platform with all project participants using a single solution.

* Fonn cannot guarantee that the calculations from the ROI calculator will apply to your business.

The savings presuppose that the company today does NOT have a cloud-based, unified collaboration platform, which brings all project participants together with 1 solution.

** Calculation for savings is based on a survey conducted in May/June 2022 on behalf of Fonn. Qualitative interviews have been conducted with several of Fonn’s individual customers. In addition, we have used the following reports and sources for default values and industry standards: